6 th September 2005 . Drilling and installation of the final FLOOD1 test site began in the Brighton area.
   
6 th September 2005 . Drilling and installation of the final FLOOD1 test site began in the Brighton area. The aim of the FLOOD1 test sites is to monitor recharge and the unsaturated and saturated zones of the chalk aquifer. Data from these test sites will be used to improve our understanding of the mechanisms involved in groundwater flooding in chalk catchments. Photo: driller drilling in rotary cored borehole.



<< First | Previous Next > | Last
2001 University of Brighton FLOOD1 Home